Open Request For Proposals
EC3 Electric Upgrade (2025-006) -- CLOSED --
- EC3 Electrical upgrade Addendum 1 05/08/2025
- Attachment "A" Floor Plan Of Machinery
- Attachment "B" Existing Electrical Panel Locations
- Attachment "C" Approximate Measurements
- Attachment "D" Prevailing Wage Determination
- Attachment "E" CNC Equipment Inventory and Electrical Specifications
- Air Compressor Base Of Design (7.5hp)
- RFI's 4-25-25
- RFI's 5-2-25
Ec3 Health Lab Renovation General Contractor (2025-007) -- CLOSED --
- Project Manual West Campus Renovations
- Health Lab Renovations Addendum 1 2025-04-29
- Health Lab Renovations Addendum 2
- Health Lab Renovations Addendum 3
- Health Lab Renovations Addendum 4
- Permit Drawings
- Prevailing Wage
- Addendum 1 Files 2025-04-29
- Addendum 2 Files 2025-05-05
- Addendum 3 File EP201-Level 1 plan
- Addendum 4 Files 2025-05-15